Calculate ROI using a CMMS

  • Writer: SiteWorks Mechanical
    SiteWorks Mechanical
  • Jan 2
  • 3 min read

To show Return on Investment (ROI) for a Computerized Maintenance Management System (CMMS) project, companies must quantify the financial gains from operational improvements against the total cost of ownership. Organizations typically report maintenance cost savings of 10–30% within the first year. 

1. Standard ROI Calculation

The standard formula for determining CMMS ROI is: ROI (%) = [(Total Benefits – Total Costs) / Total Costs] x 100 

  • Total Costs: Include software subscriptions, implementation, data migration, hardware (e.g., mobile devices), and staff training.

  • Total Benefits: The sum of direct and indirect savings over a specific timeframe (typically 1, 5, or 10 years). 

2. Key Areas of Financial Gain

To demonstrate value, companies should track and quantify the following:

  • Reduced Downtime: Unscheduled downtime can cost industries over $50,000 per minute. CMMS-driven preventive maintenance can reduce machine downtime by 30–50%.

  • Labor Efficiency: Automating work orders and using mobile CMMS can improve technician productivity by 20–30%, saving roughly 10–15 hours per week per team member.

  • Asset Lifespan Extension: Proper maintenance can increase machine life by 20–40%, delaying expensive capital replacements.

  • Inventory Optimization: CMMS tracking can reduce the value of spare parts inventory by 10–20% and supply costs by 5–10% by preventing overstocking and emergency purchases. 

3. Essential KPIs to Measure

Tracking these metrics before and after implementation provides the "hard data" needed for a business case: 

  • Planned vs. Reactive Maintenance Ratio: Aim to move from reactive to proactive; companies switching to preventive maintenance can achieve an ROI of up to 545% over long periods.

  • Mean Time to Repair (MTTR): Lower MTTR indicates faster response and repair times.

  • Overtime Costs: Calculate the reduction in hourly labor and overtime pay due to better labor forecasting.

  • SLA Compliance: Track the percentage of work orders completed within agreed timeframes to avoid penalties. 

4. Steps to Establish ROI

  1. Establish a Baseline: Document current downtime patterns, maintenance labor costs, and inventory levels.

  2. Define a Payback Period: Calculate how quickly the project will recoup its initial investment (Total CMMS Cost / Annual Cost Savings).

  3. Validate with Finance: Work with accounting teams to ensure the numbers align with corporate financial standards. 

Then explain the difference between proactive and reactive maintenance.

The fundamental difference between proactive and reactive maintenance lies in 

the timing of interventions and the level of operational control.

1. Key Definitions

  • Reactive Maintenance (Fix-on-Failure): Maintenance is performed only after a piece of equipment has already broken down or malfunctioned. It is often unplanned and occurs in a hurried, "firefighting" manner.

  • Proactive Maintenance (Preventative): Maintenance is scheduled and performed regularly to prevent failures before they occur. It relies on routine inspections, servicing, and data-informed interventions to identify potential issues early. 

2. Comparison of Impact

Feature 

Reactive Maintenance

Proactive Maintenance

Timing

After breakdown occurs

Before failure happens

Cost

25–30% higher due to emergency labor, rush parts, and lost production

12–18% lower operating expenses; every $1 spent on prevention can avert $5 in future costs

Downtime

Unexpected, disruptive, and often lengthy

Minimal and scheduled during non-peak hours

Asset Life

Shortened significantly by excessive stress and neglect

Extended by 20–75% through regular care and optimal operation

Safety

High risk of accidents during unpredictable failures

Identifies hazards early to maintain a safer environment

3. Sub-Types of Proactive Maintenance

Proactive strategies are typically divided into two categories:

  • Preventive Maintenance (PM): Tasks performed at fixed intervals based on time, usage, or manufacturer guidelines (e.g., monthly oil changes).

  • Predictive Maintenance (PdM): Uses real-time data from sensors (vibration, temperature) to monitor asset health and perform maintenance only when data indicates a failure is imminent. This is even more efficient, potentially saving 8–12% over standard preventive programs. 

4. When to Use Each

Most modern organizations aim for a 75–85% planned maintenance ratio

  • Proactive is best for critical assets essential to safety, productivity, or high-cost repairs.

  • Reactive (or Run-to-Failure) can be appropriate for non-critical, inexpensive items that are easily replaced, such as lightbulbs or non-essential office equipment. 

 
 
 